Warning: sizeof(): Parameter must be an array or an object that implements Countable in /homepages/9/d213665487/htdocs/clickandbuilds/CoalGeology/wp-content/plugins/wordpress-firewall.php on line 245

Warning: sizeof(): Parameter must be an array or an object that implements Countable in /homepages/9/d213665487/htdocs/clickandbuilds/CoalGeology/wp-content/plugins/wordpress-firewall.php on line 245

Warning: Cannot modify header information - headers already sent by (output started at /homepages/9/d213665487/htdocs/clickandbuilds/CoalGeology/wp-content/plugins/wordpress-firewall.php:245) in /homepages/9/d213665487/htdocs/clickandbuilds/CoalGeology/wp-content/plugins/wp-super-cache/wp-cache-phase2.php on line 62
Hydrologic Tests at a Drill site in 2011 – Coal Geology and Mining: Consulting Services

Hydrologic Tests at a Drill site in 2011

I have a hydrology background and I love working on different kinds of projects related to hydrology. Commonly we conduct pump tests and injection tests for various clients. Enjoy some of the snaps I took while supervising a drill and conducting straddle Packer tests. The site was pretty remote and we used ATVs to get to the site. I used TAM Packers – a different kind than what I am used to.

Ankan Basu, P.G.

[nggallery id=17]

Leave a Comment

Your email address will not be published. Required fields are marked *